SL NO | TENDER NOTICE No. | Tender invite Date | Tender Award Date | NAME OF WORK | AWARDED VALUE IN Rs. | CONTRACTOR / CONSULTANT |
1 | KRIDE/ADMIN/09/OFFICE INTERIORS/2019 | 30.12.2019 | 29.01.2020 | Office Interiors for KRIDE office at 1st Floor, Samparka Soudha Opp to Orion Mall Rajajingar, Bangalore | 28081271.6 | M/s. BUCON Engineers & Infrastrcuture Pvt Ltd, Mumbai |
2 | KRIDE/Projects/60/2020 | 28.10.2020 | 12.04.2021 | Improved Switch Expansion Joints for 60 Kg & 52 Kg Rails. | 19186812 | M/s. Ganpati Industrial Pvt Ltd Kolkata |
3 | KRIDE/Projects/37/LS/2020 | 20.02.2020 | 18.05.2020 | Cadastral Land Survey, Collection of Land Documents, Identification, Ownership Verification, Joint Measurement, Preparation of Land Acquisition plans and Associated Works in connection with the work of Bangalore Suburban Railway Project in and around Bangalore City | 10553625 | RITES LIMITED, Bangalore |
4 | K RIDE/Projects/59/2020 | 02.10.2020 | 22.01.2021 | Package 1: Consultancy Services for Land Parcels and Stations Development for Bengaluru Sub-urban Rail corridors 2 & 4 | 54398000 | IDECK, Bnaglore |
5 | KRIDE/Projects/55/DBH/2020 | 26.08.2020 | 26.11.2020 | Baiyyappanahalli – Hosur Doubling Project :Baiyyappanahalli – Hosur Doubling Project – E/w. in cutting ,embankment HEELALIGE & ANEKAL Road Station Yard | 78260504 | M/s. Bava Infrastructure Developer Pvt Ltd Mangalore |
6 | KRIDE/Projects/61/ 2020 | 06.11.2020 | 18.01.2021 | Package- 2 – “Baiyyappanahalli – Hosur Doubling project : Collection and supply of machine crushed stone ballast on cess from Km.157/600 to 182/400 | 70585320 | M/s. R K Construction Tamil Nadu |
7 | KRIDE/Projects/63/2020 | 11.11.2020 | 15.12.2021 | Plate Screws, Clamps for joggled fish plates, CI Bracket, CI distant blocks and M.S Packing piece. | 2037388 | M/s. Ganpati Industrial Pvt Ltd, Kolkata |
8 | KRIDE/Projects/53/DYC/1/2020 | 30.07.2020 | 16.12.2020 | Yeshwanthapur – Channasandra doubling project :Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous workskm 214/500 to Km 224/700 (Reach – 2) | 216660021 | M/s. RMNL – BIDPL (JV), Hyderabad |
9 | KRIDE/Projects/54/VEH/1/2020 | 05.08.2020 | 19.11.2020 | Providing Vehicles with skilled Drivers | 24,30,00,00 | Nagesh Travals, Bangalore |
10 | KRIDE/Projects/55/DBH/2020 | 26.08.2020 | 23.12.2020 | Baiyyappanahalli – Hosur Doubling Project :Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous worksBYPL-HSRA E/w.in cutting, embankment in BELENDUR Stn. | 162311081 | M/s. Bava Infrastructure Developer Pvt Ltd Mangalore |
11 | KRIDE/Projects/67/2020 | 17.12.2020. | 03.02.2021 | Baiyyappanahalli – Hosur Doubling Project : Providing of additional vent way for the exg. ROB No.420 at Km.163/100-200 by RCC Box “Cut & Cover Method” between Anekal Road and Hosur Stations | 66503293 | Balaji Enterprises, Bangalore |
12 | KRIDE/Projects/57/DBH/3/2020 | 10.09.2020 | 14.12.2020 | Baiyyappanahalli – Hosur Doubling Project -Pakage 1-Linking Track km 205/500-182/300 | 102406559 | M/s. B M Construction Tamil Nadu |
13 | K RIDE/Projects/58/2020 | 16.09.2020 | 25.11.2020 | Providing professional house keeping services along with waste disposal, security services etc. | 3522560 | Munisawamy Nagendra, Bangalore |
14 | KRIDE/Projects/52/DBH/1/2020 | 29.07.2020 | 17.12.2020 | Baiyyappanahalli – Hosur Doubling Project: Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous worksKm 165/500 to Km 174/590 (Reach- 4) | 213519111 | M/s. RMNL – BIDPL (JV), Hyderabad |
15 | K RIDE/Projects/59/2020 | 02.10.2020 | 24.02.2021 | Package 2: Consultancy Services for Land and Stations Development for Bengaluru Sub-urban Rail corridors 1 & 3 | 99700000 | THE BOSTON CONSULTING GROUP (INDIA) PVT LTD , Bangalore |
16 | KRIDE/Projects/60/2020 | 28.10.2020 | 23.04.2021 | Glass Filled Nylon -66 Insulated Liners. | 1565620 | M/s. Sheth & Co, Mumbai-400058 |
17 | KRIDE/Projects/60/2020 | 28.10.2020 | 17.05.2021 | Glued Insulated Rail Joints 60 Kg & 52 Kg rails. | 1672664 | M/s. Kontinental Steel Korporation Kolkata |
18 | KRIDE/Projects/38/US/2020 | 20.02.2020 | 18.05.2020 | Survey, Identification & Investigation of underground, over-ground & overhead Utilities & Structures using Ground Penetrating Radar [GPR) System & Manual Trenching and preparation of Conceptual Diversion Plans & Estimates for shifting the Utilities & Structures in connection with the work of Bangalore Suburban Railway Project in and around Bangalore City | 16430969 | RITES LIMITED, Bangalore |
19 | KRIDE/Projects/60/2020 | 28.10.2020 | 09.04.2021 | Grooved Rubber Sole Plates for 60 Kg PSC Line Sleepers and Points & Crossings Sleepers. | 2126713 | M/s. D.K.Steels Kolkata |
20 | KRIDE/Projects/52/DBH/1/2020 | 29.07.2020 | 16.12.2020 | Baiyyappanahalli – Hosur Doubling Project:Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous worksKm 174/590 to Km 182/500 (Reach – 3) | 229161185 | M/s. RMNL – BIDPL (JV), Hyderabad |
21 | KRIDE/Projects/60/2020 | 28.10.2020 | 22.06.2021 | Joggled Fish Plates with C clamps for 60Kg & 52 kg rails. | 2201172 | M/s Techma Engineering Enterprise Pvt Ltd Kolkata |
22 | KRIDE/Projects/60/2020 | 28.10.2020 | 19.03.2021 | Metal Liners for 60 Kg & 52 Kg rails. | 6753710 | M/s. Royal Infrastructure Limited Kolkata |
23 | KRIDE/Projects/60/2020 | 28.10.2020 | 12.04.2021 | Metal Liners for 60 Kg & 52 Kg rails. | 16845720 | M/s. Shree Laxmi Iron & Steel Works Pvt Ltd Kolkata |
24 | KRIDE/Projects/60/2020 | 28.10.2020 | 02.06.2021 | Thick web switches – 1 in12 , over riding curved switches – 1 in 8.5 & Derailing switches 60 Kg . | 45419380 | M/s. VOSSLOH COGIFER TURNOUTS INDIA PVT Medak District |
25 | KRIDE/Projects/60/2020 | 28.10.2020 | 02.06.2021 | Thick Web Switches | 20886000 | M/s. R.V. Rail Products Pvt. Ltd Kolkata |
26 | KRIDE/Projects/53/DYC/1/2020 | 30.07.2020 | 16.12.2020 | Yeshwanthapur – Channasandra doubling project :Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous worksKm 205/500 to Km 214/500 (Reach- 1) | 202640416 | M/s. RMNL – BIDPL (JV), Hyderabad |
27 | K RIDE/Projects/66/2020 | 09.12.2020 | 30.06.2021 | Yesvantpur – Channasandra and Baiyyappanahalli – Hosur and Doubling projectFabrication and Assembling of 52/60kg in situ Glued Joint | 6705000 | M/S Eden Vinimay Kolkota |
28 | KRIDE/Projects/62/ 2020 | 07.11.2020 | 27.12.2020 | Baiyyappanahalli – Hosur Doubling Project : Linking of BG track between Km.182/300 and Km.157/500 including Anekal Road, Maranayakanahalli & Hosur yards | 119257636 | M/s. B M Construction Tamil Nadu -631001 |
29 | KRIDE/Projects/63/2020 | 11.11.2020 | 29.04.2021 | PSC Mono block wide based Sleepers 60Kg. | 105776050 | M/s. Rayalaseema Concrete Sleepers Pvt Ltd Gulbarga |
30 | KRIDE/Projects/63/2020 | 11.11.2020 | 29.04.2021 | PSC Mono block wide based Sleepers 60Kg. | 49234320 | M/s. Mahadev Prestressed Products Pvt Ltd Gulbarga |
31 | KRIDE/Projects/63/2020 | 11.11.2020 | 29.04.2021 | PSC Mono block wide based Sleepers 60Kg. | 130419122 | M/s. Malu Sleepers Pvt Ltd, Bangalore |
32 | KRIDE/Projects/63/2020 | 11.11.2020 | 06.07.2021 | PSC Sleepers 60Kg for Points & Crossings 1in12 and 1in8 ½. | 25277960 | M/s. Mahadev Prestressed Products Pvt Ltd, Kalaburagi |
33 | KRIDE/Projects/63/2020 | 11.11.2020 | 18.08.2021 | PSC Sleepers 60Kg for Points & Crossings 1in12 and 1in8 ½. | 22427080 | M/s.Swarnaa Techno Constructions Pvt Ltd, Hubli |
34 | KRIDE/Projects/63/2020 | 11.11.2020 | 11.06.2021 | Fish Bolts & nuts and Spherical plain washer. | 743400 | M/s. Ganpati Industrial Pvt Ltd , Kolkata |
35 | KRIDE/Projects/63/2020 | 11.11.2020 | 11.06.2021 | Fish Bolts & nuts and Spherical plain washer. | 36108000 | M/s. Techma Engineering Enterprise Pvt Ltd, Kolkata |
36 | KRIDE/Projects/58/2020 | 16.09.2020 | 14.12.2020 | Yeshwanthapur – Channasandra doubling Project – Linking of BG track between Yesvantpur and Baiyyappanahalli “A” panel including Yesvantpur, Lottegollahalli, Hebbal and Banaswadi Yards and other misc works, | 110853582 | M/s. B M Construction Tamil Nadu |
37 | KRIDE/Projects/63/2020 | 11.11.2020 | 26.10.2021 | Plate Screws, Clamps for joggled fish plates, CI Bracket, CI distant blocks and M.S Packing piece | 182900 | M/s Techma Engineering Enterprise Pvt Ltd, Kolkata |
38 | K RIDE/Projects/65/2020 | 03.12.2020 | 02.02.2021 | Package 1 : Geotechnical investigation and associated works for Bengaluru Suburban Rail Project – Corridors 2 & 4 | 9279198 | MPACK (MYRTLE Project & consultency pvt ltd ) |
39 | K RIDE/Projects/65/2020 | 03.12.2020 | 18.02.2021 | Package 2 : Geotechnical investigation and associated works for Bengaluru Suburban Rail Project – Corridors 1 & 3 | 10928201 | Niketan Consultants |
40 | K RIDE/Projects/65/2020 | 03.12.2020 | 18.02.2021 | Strucural design for Bangaore suburban railway | 26035000 | RITES LIMITED, Bangaore |
41 | KRIDE/Projects/52/DBH/1/2020 | 29.07.2020 | 05.01.2021 | Baiyyappanahalli – Hosur Doubling Projec:t Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous worksKm 158/700 to km 165/000 (Reach – 5) | 365073117 | M/s. RMNL – BIDPL (JV), Hyderabad |
42 | KRIDE/Projects/66/2020 | 09.12.2020 | 02.02.2020 | Yeshwanthapur – Channasandra doubling project : – Earthwork in cutting, embankment and construction of Minor bridges and other miscellaneous works in Hebbal and Banaswadi Station yardsn | 79022063 | M/s. Bava Infrastructure Developer Pvt Ltd Mangalore |
43 | KRIDE/DL/01/2021 | 14.01.2021 | 14.06.2021 | Signaling outdoor works at Baiyyappanahalli-A panel and Belandur Road in connection with doubling of BYPL-HSRA section of Bangalore Division.(Package-1) | 138621321 | M/s. Ganapathy Engg. works , Hubli |
44 | KRIDE/DL/01/2021 | 14.01.2021 | 14.06.2021 | Signaling outdoor works at Heelalige and Anekal Road in connection with doubling of BYPL-HSRA section of Bangalore Division. (Package-2) | 152469674 | M/s. Progressive Engg. Mysore |
45 | KRIDE/DL/02/2021 | 21.01.2021 | 11.06.2021 | Signaling works at 2- IBS and 11 LC Gates in connection with doubling of BYPL-HSRA section of Bangalore Division. | 150305032 | M/s. Vineela Enterprises. Secunderabad |
46 | KRIDE/DL/02/2021 | 21.01.2021 | 23.06.2021 | Signaling outdoor works at Hebbal and Banasawadi in connection with doubling of YPR-CSDR section of Bangalore Division. | 143832448 | M/s. G.Satish Ent. Secunderabad |
47 | KRIDE/DL/03/2021 | 22.01.2021 | 11.06.2021 | Signaling outdoor works and indoor alterations to existing EI at Maranayakanahalli (Ansaldo make EI) and Hosur ( Kyosan) in connection with doubling of BYPL-HSRA section of Bangalore Division. (Single Package) | 126693710 | M/s. Progressive Engg. Mysore |
48 | KRIDE/DL/03/2021 | 22.01.2021 | 11.06.2021 | Signaling outdoor works and indoor aletrations to existing EI at YPR Bye-pass( Ansaldo make EI)and out door signalling work at Lottegollahalli in connection with doubling with Auto signalling in YPR-CSDR section of Bangalore Division. | 110954295 | M/s. Vineela Enterprises. Secunderabad |
49 | KRIDE/DL/04/2021 | 30.01.2021 | 14.06.2021 | CMS Crossing | 24874400 | M/s. Voestalpine VAE VKN India Pvt Ltd Delhi |
50 | KRIDE/DL/05/2021 | 02.02.2021 | 11.06.2021 | Signaling works at one IBS and 7 (seven) LC Gates in connection with doubling of YPR-C section of Bangalore Division. | 75531893 | M/s Ganapathi engg company (Anjeneyalu) |
51 | KRIDE/DL/08/2021 | 25.02.2021 | 22.06.2021 | Baiyyappanahalli – Hosur Doubling Project :Proposed construction of Station Building, Platforms, FOB’s and Platform Shelters at Heelalige & Anekal Road Railway Stations including all Electrical works and other miscellaneous works | 154013048 | M/s. SRICO Projects Pvt Ltd , Hyderbad |
52 | KRIDE/DL/09/2021 | 26.02.2021 | 25.06.2021 | Signalling indoor work with Electronic intelocking at Baiyappanahalli-A panel, Belandur Road, Heelalige and Anekal Road in connection with doubling of BYPL-HSRA section of Bangalore Division. | 118493892 | M/s SS Railworks Ltd, Hyderabad |
53 | KRIDE/DL/10/2021 | 27.02.2021 | 25.05.2021 | Signalling indoor work with Electronic intelocking at Lottegollahalli, Hebbal and Banasawadi in connection with doubling of YPR-CSDR section of Bangalore Division. | 101321550 | M/s. G.Satish Enterprises Secunderabad) |
54 | KRIDE/DL/14/2021 | 26.03.2021 | 11.06.2021 | Shifting of Signalling & Telecommunication cables, Location boxes and signals in Heelalige to Hosur section to facilitate civil engineering earth work in connection with doubling of BYPL-HSRA section of Bangalore Division. | 4535534 | M/s. INDUSTRUS INC. JAIPUR |
55 | K-RIDE/DL/12/2021 | 11.03.2021 | 11.06.2021 | Baiyyappanahalli – Hosur Doubling Project – “Collection and supply of Machine crushed stone Ballast on Cess from Km.182/400 to Km.205/300 in Heelalige (Incl) – Baiyyappanahalli ‘A’ panel section and also depot collection at KM 188/200 (Huskur village) | 87034038 | M/s. R K Construction Tamil Nadu |
56 | K-RIDE/DL/05/2021/5057 | 05.04.2021 | 05.04.2021 | Providing skilled manpower to K-RIDE for office/field work” | 19677436 | Ms Digital Web world Private Limited ,Delhi |
57 | KRIDE/CIVIL/ESIA/2021-2022 | 03.08.2021 | 10.11.2021 | Environmental impact assesment and social impact assesment for BSRP | 9558000 | M/s IDECK Ltd, Bengaluru |
58 | KRIDE/DL/07/2022 | 01.04.2022 | 10.05.2022 | Design, Supply, Erection, Testing & Commissioning of 25 KV, AC, 50 Hz, Single Phase, Traction Over Head Equipment for Doubling of Belandur Road (km 197.6) (Including) – Anekal Road (km 171.6) (Including) Section (34 Track Kilometer approximately) including any Modification in Existing Overhead Equipment if required in Bangalore division of South Western Railway. | 209968835 | M/s Texmaco Rail & Engineering Ltd, Kolkota |
59 | KRIDE/Gen./01/2022/01 dated 04.03.2022 | 04.03.2022 | 27.06.2022 | Providing Vehicles with skilled and professional Drivers for the officials of K RIDE | 3,67,85,426 | M/s Marshall Tours ‘N’ Travels |
60 | K RIDE/Gen./02/2022 dated 24.02.2022 | 24.02.2022 | 27.06.2022 | Providing professional house keeping services along with waste disposal, security services etc. | 36,72,499.84 | M/s Munisawamy Nagendra |
61 | KRIDE/Gen./03/2022 dated | 02.06.2022 | 12.08.2022 | Providing skilled Manpower to K RIDE for office/ field work |
3,14,68,416 | M/s. Quess Corp Limited, New Delhi |
62 | KRIDE/BSRP/11/2022 | 04.02.2022 | 22.08.2022 | Shifting ofSignalling & Telecommunication underground utilites in Heelialige – Rajankunte scetion of Bangalore Division to faclitate Bangalore Suburban Rail Project (BSRP) – Corridor -4 | 25,57,80,337 | M/s. Texmaco Rail & Engineering Ltd, New Delhi |
63 | K-RIDE/BSRP/10/2021 | 23.11.2021 | 26.08.2022 | Design and Construction of Elevated Viaduct of Length 8.027 Km ( From Ch 0.675 Km to -0.050 Km & Km Ch : 11.137 Km to 18.350 Km) including ramps and formation in embankments/cutting including blanketing, Major Bridges, RUB, ROB, ROR, retaining wall, sacrificial retaining wall and drains, Utility diversion of At – Garde section of length 17.551 Km (From Ch – 0.964 Km To Ch : 0.675 Km, From Ch : 0.050 Km to Ch : 11.137 Km & From Ch: 18.350 Km to 24.425 Km) and other related infrastructural works from Benniganahalli to Chikkabanavara, excluding station buildings of Corridor – 2 of Bengaluru Suburban Railway Project ( BSRP) on EPC basis – Notification of Award of Contract – reg | 8599700000 | M/s. Larsen & Toubro Limited, Mumbai |
64 | K RIDE/BSRP/08/2021 | 22-09-2021 | 03-03-2022 | Engagement of General Consultant for Bengaluru Suburban Railway Project (BSRP) | ₹196,93,98,000/- | EGIS RAIL – AECOM – LBCPL JV. Gurugram, Haryana |
65 | KRIDE/BSRP/02/2021 | 01-04-2021 | 20-09-2021 | Shifting of Signalling & Telecommunication underground utilities in Baiyyappanahalli to Chikkabanavar section of Bangalore Division to facilitate Bangalore Suburban Railway Project (BSRP) Corridor – 2 | 164837327 | M/s. AR Rail Vikas Services Pvt Ltd |
66 | K RIDE/DL/10/2022 | 09-05-2022 | 29-09-2022 | Shifting of Electrical Utilities infringing to proposed track doubling work between Yesvantpur to Hosur | 85538075.41 | M/s. Gowtham Electricals, Chikaballapur |
67 | K-RIDE/BSRP/12/2022 | 29-04-2022 | 14-12-2022 | Preparation of JMC sketches, Total station survey Ground demarcation for Corridors – 1,3 & 4 , balance works of Corridor – 2 and other associated areas; Cadastral Survey for Depots, Substations and Facilities; Tree enumeration and survey fro the Corridors – 1 & 3 and other associated areas of Bangalore Suburban Railway project | 1,80,93,500.00 | M/s. SATRA Services & Solutions Pvt Ltd |
68 | K- RIDE/BSRP/15/2022 | 13-09-2022 | 18-01-2023 | Shifting of Electrical Utilities infringing proposed Bengaluru suburban Rail project Corridor – 2from Benniganahalli to Chikkabanaavara (Excluding Lottegollahalli to Yeshvanthpur) | 2,61,63,453.95 | M/s. Aditya Electrical Enterprises, Bengaluru |
69 | K-RIDE/DL/15/2022 | 23-09-2022 | 20-01-2023 | “Signalling indoor with electronic interlocking and outdoor works at new crossing station Huskur between Heelalige-Belandur Road stations and 1) Provision of Telecom equipments from Yesvantpur Bye pass to Anekal Road stations. 2) Provision of 6 quad cable and OFC from Heelalige to Hosur stations. 3) Provision of Fire alarm, CC cameras from Yesvantpur Bye pass to Hosur stations” |
165053024 | M/s. Ganapathy Engg. works , Hubli |
70 | K-RIDE/DL/09/2022 | 04-05-2022 | 03-02-2023 | Baiyyappanahalli – Hosur Doubling Project: Construction of 1 x 76.2m span open web girder (welded through type) for Bridge No. 533, 1 x 18.30m span composite welded girder + 2 x 7.5m RCC box extension for Bridge No. 531, Prestressed concrete (PSC) Box girders for Br. No. 519A (only super structure) and steel girder bridge to carry pipe line for Br No. 516A for new doubling line between Baiyyappanahalli “A” panel and Belandur Road Station in Bangalore Division of South Western Railway”. | 25,29,66,971.85 | M/s. Kiran Infra engineers Ltd |
71 | K- RIDE/DL/18/2022 | 10-10-2022 | 03-02-2023 | Execution of Earthwork in cutting, embankment and construction of Minor bridges, Major bridge, RUBs and allied works in between Yesvantpur and Baiyyappanahalli and construction of 4 th line between Yesvantpur Bypass – Lottegollahalli in connection with Yesvantpur – Channasandra doubling project in Bangalore Division of South Western Railway”. | 54,42,13,057.07 | M/s. PJB – Gounder (JV) |
72 | KRIDE/DL/16/2022 | 03.10.2022 | 21.02.2023 | Design Supply, Erection, Testing & Commissioning of 25 KV , AC, 50 Hz, Single Phase, Traction Over Head Equipment for Doubling of Isnapur (Incl.) (Km 224/000)- Banaswadi (Excl.) (Km 211/090) section (29 Track Kilometre approximately) including construction of Hebbal SP, Modification of Isnapur SSP and diversion of IR track for 6 no’s of LC elimination to construct Corridor – 2 of BSRP “ | 25,47,15,628.97/- | M/s. BCPL Railway Infrastructure Limited , West Bengal |
73 | K-RIDE/DL/03/2023 | 27.01.2023 | 22.05.2023 | Baiyyappanahalli – Hosur Doubling Project – Earthwork in formation, blanketing, minor bridges, platforms, station buildings, FOB etc. at Belandur road and new Huskur yard & Blanketing in Railway formation between Baiyyappanahalli – Karmelaram and other miscellaneous works in Bengaluru Division of South Western Railway” | 42,05,46,477/- | M/s. Gounder and PJB (JV) Bangalore – 560076 |
74 | K-RIDE/DL/04/2023 | 31.01.2023 | 22.05.2023 | Baiyyappanahalli – Hosur Doubling Project – Construction of Major Bridges 412, 456,474, 420 (ROB), RUB No 470 (over NH 44) between Heelalige and Hosur & balance works of Bridge No. 513 at Bellandur road yard in Bengaluru Division of South Western Railway | 53,25,12,950/- | M/s. MVVS – SV (JV) Bangalore – 560077 |
75 | K-RIDE/DL/02/2023 | 27.01.2023 | 28.06.2023 | Baiyyappanahalli -Hosur Doubling Project -: Earthwork in formation, Blanketing, minor bridges/RUBs, FOB, Platforms and ofher miscellaneous works between Heelalige – Hosur Bangalore Division of South Western Railway. | 91,08,87,136/- | M/s. ESSVY Constructions India Pvt Ltd Secunderabad – 500009 |
76 | K-RIDE/DL/05/2023 | 31.01.2023 | 28.06.2023 | Yesvantpur – Channasandra doubliling Project: Construction of Station/Service Buildings, Platforms, PF Shelters, FOBs and other Miscellaneous works between Yesvantpur to Baiyyappanahalli “A” Cabin in Bangalore division of South Western Railway. | 40,02,20,020/- | M/s. ESSVY Constructions India Pvt Ltd Secunderabad – 500009 |
77 | K-RIDE/BSRP/17/2023 | 10.02.2023 | 22.06.2023 | Shifting of Electrical Utilites infrining Proposed Corrdidro – 2 of Bengaluru Suburban Rail project between Lottegollahalli to Yeswantpur of Chikkbanavara to Baiyyappanahalli Section | 11,28,11,591/- | M/s. Sri Lakshminarasimha Electricals, Tumakuru |
78 | KRIDE/BSRP/20/2023 | 03.06.2023 | 11.09.2023 | S & T utility Shifting in BSRP Corridor -1 from Yelahanka Jn. To Devanahalli stations of Bangalore Division | 15,88,40,123/- | M/s. Texmo Rail & Engineering Ltd, Mumbai |
79 | KRIDE/DL/14/2022 | 23.09.2022 | 29.08.2023 | Internal Electrification of Goomties, IBS, Service buildings (North, South, Central) at Yesvantpur -, Lottegollahalli and Hebbal Station Building provision of open and covered platfrom at Hebbal and Hosur, power supply arrangement and any other associated works releated to Yesvantpur – Hosur Doubling work | 1,94,02,188/- | M/s. Standard Electrical Enterprises |
80 | K-RIDE/DL/01/2023 | 25.01.2023 | 17.10.2023 | Yesvantpur – Channasandra Doubling Project – Collection and supply of machine crushed stone ballast on cess between Yesvantpur to Baiyyappanahalli ‘A’ Panel section and also at Perianaga Thunai (PRNT) yard depot in Bengaluru Division of South Western Railway | 9,59,69,735/- | M/s. N Ranganatha, Bangarpet |
81 | KRIDE/2023-24/BG/WORK_ INDENT1 | 24.05.2023 | 30.12.2023 | Design and Construction of elevated Viaduct of length 8.960 Km & At – Grade formation of length 37.920 Km (excl Station Bldgs.) including works between Heelalige and Rajanukunte of Corridor – 04 of Bengaluru Suburban Railway Project (BSRP)” | 1040,51,42,000/- | M/s. Larsen & Toubro Ltd, Mumbai – 400093 |